About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

B-422594 Aug 13, 2024 1 (2024-08-13)

handle is hein.gao/gaoqrw0001 and id is 1 raw text is: 



                    U.S. GOVERNMENT   ACCOUNTABILITY OFFICE
441 G St. N.W.                                                   Comptroller General
Washington, DC 20548                                              of the United States

       Deio                                          DOCUMENT   FOR PUBLIC RELEASE
Decision
                                                   The decision issued on the date below was subject to
                                                   a GAO Protective Order. This redacted version has
Matter of:   ASFA  International Construction, Inc. a
                                                   been approved for public release.
File:        B-422594

Date:     August 13,   2024

Edward  J. Tolchin, Esq., Offit Kurman, P.A., for the protester.
Regina Schowalter, Esq., Department of the Army, for the agency.
Heather Self, Esq., and Peter H. Tran, Esq., Office of the General Counsel, GAO,
participated in the preparation of the decision.
DIGEST

In procurement conducted using two-phase selection procedures of Federal Acquisition
Regulation subpart 36.3, protest of agency's evaluation of phase one proposal and
decision to exclude protester from phase two is denied where the agency's evaluation
was reasonable and consistent with the solicitation.
DECISION

ASFA  International Construction, Inc. (ASFA), of Seyhan, Turkey, protests its exclusion
from consideration for award under request for proposals (RFP) No. W912GB23R0041,
issued by the Department of the Army, Army Corps of Engineers for construction
services in Poland. The protester challenges the agency's evaluation of the firm's
proposal.

We  deny the protest.

BACKGROUND

On  September 6, 2023, the agency issued the solicitation using the two-phase selection
procedures of Federal Acquisition Regulation (FAR) subpart 36.3 for design-bid (DB)
and design-bid-build (DBB) construction services. Agency Report (AR), Tab 4, Initial
RFP  at 21; Tab 14, Conformed RFP at 845, 849-850.1 The solicitation contemplated
award of a target of five indefinite-delivery, indefinite-quantity (IDIQ), multiple-award
task order contracts (MATOCs) for DB and DBB construction requirements providing


1 As part of its report responding to the protest, the agency submitted documents as a
single Adobe PDF  file of continuously paginated tabs. Our citations to documents in the
record use the continuous pagination. Unless otherwise noted, our citations to the RFP
are to the phase 1 conformed solicitation produced at tab 14 of the agency's report.

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most