B-281499 1 (1999-02-12)

handle is hein.gao/gaocrptajhb0001 and id is 1 raw text is: 


oComptroller General
             of the United States
             Washington, D.C. 20548
             Decision




             Matter of: EDL Construction, Inc.

             File:       B-281499

             Date:        February 12, 1999

             Robert W. Moore and Robert E. Moore, for the protester.
             William A. Wilcox, Jr., Esq., International Boundary and Water Commission, for the
             agency.
             Jacqueline Maeder, Esq., and Paul Lieberman, Esq., Office of the General Counsel,
             GAO, participated in the preparation of the decision.
             DIGEST

             Determination to cancel invitation for bids after bid opening is unobjectionable
             where the agency could not find reasonable the sole bid submitted because it was
             significantly higher than the government estimate, and the agency subsequently
             determined that the solicitation specifications no longer reflected its actual needs.
             DECISION

             EDL Construction, Inc. protests the cancellation after bid opening of invitation for
             bids (IFB) No. 98-04, issued by the United States Section of the International
             Boundary and Water Commission (Commission), for various improvements at the
             South Bay International Wastewater Treatment Plant (SBIWTP) in San Diego
             County, California. The Commission rejected EDL's bid, the only one submitted,
             and plans to resolicit the requirement under a revised solicitation.

             We deny the protest.

             The IFB, issued as a total small business set-aside on June 8, 1998, contemplated
             the award of a fixed-price contract for various improvement projects at the
             SBIWTP, including: installation of a 30-inch emergency sewer connection
             replacement, demolition of existing piping and isolation valve, and grading
             improvements; installation of an 18-inch gravity sewer pipe; installation of access
             ladders and platforms for five influent pumps; repair of existing security gate no. 5;
             and installation of gate control improvements at gate nos. 2, 3 and 4. The IFB
             requested a single price for all of the work.

             At bid opening on August 20, EDL's bid of $974,334 was the only one received by
             the agency.1 After bid opening, the agency contacted the other bidders on the


1The IFB had been sent to 29 prospective bidders.

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most