B-280405 1 (1998-08-24)

handle is hein.gao/gaocrptahvi0001 and id is 1 raw text is: 


oComptroller General
             of the United States
             Washington, D.C. 20548
             Decision




             Matter of: Caddell Construction Company, hie.

             File:      B-280405

             Date:      August 24, 1998

             Timothy Sullivan, Esq., and Katherine S. Nucci, Esq., Adduci, Mastriani &
             Schaumberg, for the protester.
             Edward P. Meyerson, Esq., and Stanley W. Logan, Esq., Berkowitz, Lefkovits,
             Isom & Kushner, and Laurence Schor, Esq., McManus, Schor, Asmar & Darden, for
             Bill Harbert Construction Company, an intervenor.
             Carlton A. Arnold, Esq., and Robert W. Pessolano, Esq., Department of the Army,
             for the agency.
             Adam Vodraska, Esq., and James A. Spangenberg, Esq., Office of the General
             Counsel, GAO, participated in the preparation of the decision.
             DIGEST

             Contracting agency reasonably rejected hand-carried proposal as late where a
             preponderance of the evidence establishes that the protester did not deliver the
             proposal to the designated location prior to the time set for closing.
             DECISION

             Caddell Construction Company, Inc. protests the rejection of its proposal as late
             under request for proposals (RFP) No. DACA27-98-R-0020, issued by the U.S. Army
             Corps of Engineers, Louisville District, for construction of the 3rd Brigade Barracks
             Complex, Phase III, at Fort Campbell, Kentucky.1

             We deny the protest.

             BACKGROUND

             The RFP required offerors to submit their original proposals, and the requisite
             number of copies, to Room 821 of the Corps of Engineers offices at 600 Dr. Martin
             Luther King, Jr. Place (the Federal Building), Louisville, Kentucky, no later than
             4:30 p.m. local time, April 21, 1998. RFP at A-i, L-7. The solicitation included the
             full text of the late proposal provision of the standard Instructions to Offerors--
             Competitive Acquisition (Oct 1997), Federal Acquisition Regulation (FAR)
             § 52.215-1(c)(3). RFP at L-3.


1This decision is made under our express option procedures, 4 C.F.R. § 21.10 (1998).

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most