About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

B-277735.2 1 (1997-11-21)

handle is hein.gao/gaocrptagdn0001 and id is 1 raw text is: 


oComptroller General
             of the United States
             Washington, D.C. 20548
             Decision




             Matter of: Howard W. Pence, Inc.

             File:       B-277735.2

             Date:       November 21, 1997

             Lawrence W. Luecking for the protester.
             Robert W. Pessolano, Esq., Department of the Army, for the agency.
             Christine F. Davis, Esq., and Guy R. Pietrovito, Esq., Office of the General Counsel,
             GAO, participated in the preparation of the decision.
             DIGEST

             Agency properly canceled a solicitation after bid opening based upon the
             unreasonableness of the bid prices, where the bid in line for award exceeded the
             government estimate by 43 percent and there is no showing that the government
             estimate was in error or that the decision to cancel was made in bad faith.
             DECISION

             Howard W. Pence, Inc. protests the cancellation of invitation for bids (IFB)
             No. DACA27-97-B-0025, issued by the United States Army Corps of Engineers,
             Louisville District, for renovation of barracks at Fort Campbell, Kentucky.

             We deny the protest.

             The IFB provided for the award of an indefinite delivery, indefinite quantity contract
             for renovation of up to seven barracks buildings, i.e., two buildings each in the base
             and first option year, and three buildings in the second option year. The contractor
             will demolish existing, interior partitions and install new ones; upgrade the
             electrical and heating, ventilation and air conditioning systems; renovate
             mini-kitchens; replace windows, doors, and roof; and repair, clean, and seal the
             building's exterior facade. The IFB bidding schedule requested unit and extended
             prices for 57 contract line items (CLIN), which covered the various work
             requirements for the buildings to be renovated in the base and option years.

             The agency received five bids on the July 29, 1997, bid opening. A comparison of
             the bids and the government estimate for the required work, including options,
             follows:

                       Bidder A                         $14,454,016
                       Pence                            $27,809,919
                       Bidder C                         $28,735,460

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most