About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

B-210314.3 1 (1983-03-09)

handle is hein.gao/gaobadkxv0001 and id is 1 raw text is: 





                         THE COMPTROLLER OENERAL
DECISION                   F OP THE UNITED   STATES
                     :   WA SINGTON. 0.C. 20548




FILE: B-210314.3              DATE: March 9, 1983
MATTER OF:Four Star Maintenance Corporation--
            Reconsideration

DIGEST:

  1.   Where an appeal of the small business size
       status was not filed within 5 days of bid
       opening, the agency was not required to
       suspend contracting action for the pre-
       scribed regulatory period.

  2.   Agency was not required to withhold award pend-
       ing a Small Business Administration Size Appeals
       Board post-bid opening ruling on an appeal of the
       small business size standard contained in the
       solicitation because the ruling has prospective
       effect only.


       Four Star Maintenance Corporation-requests recon-
  sideration of Consolidated Marketing Network, Inc.; Four
  Star Maintenance Corporation, 3- 10314; B-210314.2,
  February 7, 1983, 83-1 CPD __,in which we dismissed Four
  Star's protest against the proposed award of a contract for
  base housing repair and maintenance services at Beale Air
  Force Base, California, under invitation for bids No.
  F04666-82-B-0039. We affirm our prior decision.

      _Four Star requests reconsideration of its allegation
  that the low bidder, and ultimate awardee, under the invi-
  tation exceeded the small business size limitation con-
  tained in the solicitation. In dismissing the allegation
  in the original decision, we pointed out that the Small
  Business Administration (SBA) has conclusive authority to
  determine a small business concern's size status for pro-
  curement purposes. 15 U.S.C. § 637(b)(6) (1976). In this
  regard, we noted that if Four Star wished to challenge the
  size status of the low bidder, it should have protested to
  the contracting officer within 5 days after bid opening, in
  accord with SBA regulations at 13 C.F.R. § 121.3-5(a)
  (1982). We noted further that the contracting officer
  would have refecred the matter to the SBA regional direc-
  tor, whose decision, if adverse, also could have been



                   0,2

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most