                         4  hi:4E COMPTROLLERN UENJRAL
             \aJECIU      HIN *(w.. Oa        THUUNITED         SVATEU
          W A 0 P01j Wtr'NQGTOIIW.`0.0. 12ROO54GS



              FILE:   B-189544                  DATE:  Ostobvr 25, 1977
o             MATTER   OF:   S. J. Groves & Sons Company

              DIGEST:
              1. Worksheets  and other information submitted by bidder to
                 agency in support of bid correction will be cons dered by
                 GAO  notwithstanding that same information has not been
                 furnished protester.
              2. Where  mistakeina bid was alleged prior to award and
                 bidder preseited clear and convincing evidence of 'mistake
                 and of bid actizafly ttehtded, ahd bid as corrected remains
                 low by substantial amount, GAO will not disturb administra-
             *   tfva determination to allow correction.
             3.  Fact that' portions of bid may be unbalanced does not disturb
                 contractingoficer's determination that clear and convincing
                 evidence of mistake and intended bid exists as to other
                 portions of bid.
                 S. J., Groves & Sons.Company (Grves)  protests the correc-
              tion of the lowbid of B(& Conutructors (B4) under Invitation for
              Bids,(IFB) No. DC-73970 issued by the Bureau of Reclamation,
              United States Department of the Interior (Interior), for the con-
              struction of a section of.the Tehama-Colusa Canal at its Central
              Valley Project, California.
                 On A  ril 19, 1577, Interior opened The six bids which had
              been submitted in response to the sibject FB- B4 submitted
              the low bid 'f $18, 970. 693. Qroves submitted the next low bid
              of $22, 922, 322, The Government estimate for the work Was
              $25, 149, 730. Odig tdthe disparity between the low bid'and the
              next low bid and Government estimate, B4 was contacted by the
              cohtra'1ihgoffier on April 29, 1977, and requested to verify
              its bid 'price. By nailgra dated May 4, 1977, B4 advised
              that it erred inits lump-sum subtotil bid of $1, 740, 000 for
              Items 60othrough83of theIFB On   May6,   1977, B4 furnished
              detailed iiiformation which hidicated that in entering its lump-
              sum bid for Items 60-83 (furnishing and laying pipe) it had
              failed to enter the direct costs for the siphons (Items 79-83)


L

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most