B-187556 1 (1976-10-22)

handle is hein.gao/gaobadefs0001 and id is 1 raw text is: 







                                     r-A      rTH2 CONIPTROLLgip GENERAL
-24             DECISION           .         OF   THE     UNIT3         TsA'T r=a
                                 (1)  4 Ws  WASHINC3TON, D,C, 2O084B



                FILE:  13-187556                    DATE:    October 22, 16

                MATTEF OF: Holloway Enterprises, Inc.


                DIGEST;

                     Claim for contract prite increase because of mistake in
                     bid iscdInied where contractor, with knowledge of mistake
                     and withi'ut protest or reservation of right to request an
                     upward pilce adjustment,' accepted award of contract at
                     original bid pri.ce.


                     The Naval Pacilitieo Engineering Comnand requests a decision
               on the claim of  iolloway Enterprlses, Inc. (Holloway) for an
               upward price adjustment in cuntract No. N62477-75-C-1324 because
               of an alleged mistake in bid.

                     Hollowliy su imitted a bid of .507,490.68. In view of the
               sizeable variance between that bid (three lower bids were rejected)
               and the Government estimate ($605,000) for the required janitorial
               servicesp HlolloayJwas orally requeiLted to verify its bid. It is
               reported that Hfolldway subsequently informed the Navy that a sig-
               nificant error wai discovered in tb  bid worksheets and that with-
               drawal of the bid sould be requested,  However, instead of requesting
               withdrawal, Holloway sent the followiug letter;

                      * **After'reviewing   our figures as submitted,
                     ourCoapany hus decided that we will accept the
                     contract.*   +

               Holloway was awarded the contract at its original bid price on
               July 1, 1975.

                     Following coppletion of the contract:, Holloway, by letter
               dated July 22, 7.976, alleged thst its original bid price was
               inadvertently based on the wage rates contained in a superseded
               wage determination and tequested an increase in the contract price
               in the amount of $44,197.98.

                     WhLn, as in this cane, a bidder agrees to accept award at
               its bid price after it is adequately placed an notice of a possible
               mistake in its bid, the  subsequent acceptance of the bid generally


a

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most