         G     A     0                                                 Comptroller General
       Accountability * Integrity * Reliability                         of the United States
United States Government Accountability Office      DOCUMENT FOR PUBLIC RELEASE
Washington, DC 20548                                  The decision issued on the date below was subject to a
                                                      GAO Protective Order. This redacted version has been
                                                      approved for public release.

          Decision

          Matter  of:  HDT  Tactical Systems, Inc.

          File:        B-403875

          Date:        December  14, 2010

          David A. Churchill, Esq., Luke C. Platzer, Esq., and Damien C. Specht, Esq., Jenner &
          Block LLP, for the protester.
          Richard P. Rector, Esq., and Nedra Adams, Esq., DLA Piper LLP, for Mainstream
          Engineering, Inc., an intervenor.
          Debra J. Talley, Esq., Jessica Easton, Esq., and Sarah McWilliams, Esq., Department
          of the Army, for the agency.
          Scott H. Riback, Esq., and John M. Melody, Esq., Office of the General Counsel, GAO,
          participated in the preparation of the decision.
          DIGEST

          Protest that agency misevaluated protester's proposal in making a downselection
          decision is denied, where record shows that agency properly eliminated the proposal
          for failing to meet a test standard established as a minimum requirement for further
          consideration in the competition.
          DECISION

          HDT  Tactical Systems, Inc., of Solon, Ohio, protests the elimination of its proposal
          from further consideration during a downselection procedure conducted by the
          Department  of the Army in connection with its acquisition of variously-sized
          improved environmental control units (IECUs), under request for proposals
          No. W909MY-08-R-0014.  HDT  maintains that its IECUs were misevaluated during a
          testing phase of the acquisition, that the agency treated it and its competitor,
          Mainstream Engineering, Inc., of Rockledge, Florida, disparately, and that the agency
          unreasonably failed to engage in discussions.

          We deny the protest.

          The agency originally issued the RFP in 2008 and awarded contracts to both HDT
          and Mainstream. Both contracts contemplated potentially four phases of
          performance. During phase one, both contractors were to design and fabricate two
          prototype IECUs, a 9,000 BTU unit, and an 18,000 BTU unit. At the conclusion of this
          initial effort, the contracts called for the performance of testing on the prototype

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most