About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

B-402054 1 (2009-12-29)

handle is hein.gao/gaobadbdc0001 and id is 1 raw text is: 




         ,G    A     O                                                Comptroller General
LXn ,  Accountability * Integrity * Reliability                        of the United States
United States Government Accountability Office    DOCUMENT FOR PUBLIC RELEASE
Washington, DC 20548                                 The decision issued on the date below was subject to a
                                                     GAO Protective Order. This redacted version has been
                                                     approved for public release.

          Decision

          Matter  of:  Chant Engineering Company, Inc.

          File:       B-402054

          Date:       December   29, 2009

          Marc Lamer, Esq., Kostos and Lamer, P.C., for the protester.
          Thomas  Janczewski, Esq., Michael Best & Friedrich LLP, for Clover Industries, an
          intervenor.
          Paul Sax, Esq., Department of the Army, for the agency.
          Jacqueline Maeder, Esq., and John M. Melody, Esq., Office of General Counsel, GAO,
          participated in the preparation of the decision.
          DIGEST

          Protest that quotation, on its face, should have led agency to conclude that winning
          vendor could not and would not comply with limitation on subcontracting clause is
          denied where protester points to no clear indications in the quotation that the
          successful vendor will not comply with the clause.
          DECISION

          Chant Engineering Company, Inc., of New Britain, Pennsylvania, protests the
          issuance of a purchase order to Clover Industries, Inc., of Wausau, Wisconsin, under
          U.S. Army Corps of Engineers request for quotations (RFQ) No. W911XK-09-T-0082,
          issued as a small business set-aside for the rehabilitation of the Poe Lock hydraulic
          system at Sault Saint Marie, Michigan. Chant argues that Clover's quotation is
          unacceptable because it exceeded the limitation on subcontracting and is
          noncompliant with the small business set-aside requirements in the RFQ.

          We deny the protest.

          The RFQ, issued July 13, 2009, provided for the issuance of a fixed-price purchase
          order for the construction, fabrication, assembly, testing and delivery of the
          necessary hydraulic system components. Specifically, the RFQ required vendors to
          supply four hydraulic power units, six miter gate assemblies, six complete limit
          switch drive assemblies, four Tainter valve cylinders, two fender boom socket
          cylinders, two fender boom cylinders, six miter gate manifolds, four Tainter valve
          manifolds, two fender boom brake and boom manifolds, two fender boom brake and
          socket manifolds, spare parts and tools. RFQ at C4-C5. The purchase order was to

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most