                          COMPTROLLER GENERAL, Op ThE; UNITED STATES
                                    WFZHINGTOII, D.C.W0548c(q.'6/4
       nI0

           B-179587                            Septemlber 27, 1973


                                                            \.4


           The Honorable
           The   cretary tof the Aru
           Dear Mr. eoratazys

                Reforence ts made to a letter dated Aiust o1973,t#rai
           the Gonero Counusolp Offtee of the Chief of ngineerap reqaesting
           our dbision relhtiye to abmistQho in bid alleued.by-thW-cone
           traotoi. after naard'unde. IM])A AW25-73-)3-00!4, The invitation
           for bide oafle4 o the cvntruotion of metal buildinga in which
           emrgeney generators will later be installed at nine Leparate
           ncvigation locks on the Isissippi 'River, Item Ro, 1 of the bA
           schedule covered the construction of the buildings and Item o, 2
           overed the installation of utility lines from exieting buildingo
           to the new buildtngn

                On June 193W3, five bdo were opened, The three lovst
           bid for both items Ver $12 6,l0, submitted by r.iliam-*m
           Houscwricht; +a31746, ubmitted by Eddinfield Construction
           Cctpany; and 035#937P smtitted by Leonar Blindernan Construc-
           tion Co, Inc, The Government's estimate waa3 $l4*,st1, Without
           profit. After bid openingg a discrepancy was noted in the low bid
           under Item 2 of the bidding chedule. The uniA pricen multiplied
           by the quantities did not agree with the oxtendid prieos.  In
           every subitcm, the extendea price exceeded the uxnit prico, and the
           result was that the correctly eztended unit prices ihan added up1
           totalled #20#451# or $5#709 loss than the total Lid prico.

               Without aAing the low bidder to confirm his sido tho
           contracting officer notified him in a letter dated Jina 27, 1973,
           that io bid yae accepted in the amount of 4120#1151,

               by letter dated July 3, 1973, r. ousewrittt alleged a
           histake in bid and requested refonmation of the contract. to that of
           his: original bid of 126#160. In this letter, and in an earlier






'/719.9
'lb

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most