About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

GAO-08-257R 1 (2008-02-08)

handle is hein.gao/gaocrptawfo0001 and id is 1 raw text is: 



  SGAO

       Accountability * Integrity * Reliability
United States Government Accountability Office
Washington, DC 20548


         February 8, 2008

         The Honorable Ike N. Skelton
         Chairman
         Committee on Armed Services
         House of Representatives

         The Honorable Solomon P. Ortiz
         Chairman
         Readiness Subcommittee
         Committee on Armed Services
         House of Representatives

         Subject: Defense Logistics: Army Has Not Fully Planned or Budgeted for the
         Reconstitution of Its Afloat Prepositioned Stocks

         At various stages throughout the current operations in Iraq and Afghanistan, the
         Army has withdrawn equipment from its stored, or prepositioned, stock sets around
         the world, as well as from its afloat stocks, thus depleting a large portion of its
         prepositioned stocks.' The Army prepositions equipment at diverse strategic
         locations in order to field combat-ready forces in days rather than the weeks it would
         take if equipment had to be moved from the United States to the location of the
         conflict. The Army Prepositioned Stocks (APS) program supports the National
         Military Strategy and is an important part of the Department of Defense's (DOD)
         overall strategic mobility framework. The APS program depends on prepositioned
         unit sets of equipment and sustainment stocks to enable troops to deploy rapidly and
         train with prepositioned equipment before beginning combat operations. As we
         testified in January 2007 and March 2006, however, sustained continuing operations
         have taken a toll on the condition and readiness of military equipment, and the Army
         faces a number of ongoing and long-term challenges that will affect both the timing
         and cost of equipment repair and replacement, particularly to its prepositioned
         stocks.2

         Over the past several years, GAO and other audit agencies have reported on
         numerous long-standing problems facing DOD's and the Army's prepositioning

         'The Army prepositions stocks primarily at land sites in Europe, Northeast Asia, Southwest Asia, and
         aboard ships afloat near Guam and Diego Garcia. During the initial stages of Operation Iraqi Freedom,
         the Army primarily used prepositioned stocks afloat (APS-3) and from Southwest Asia (APS-5).
         2GAO, Defense Logistics: Preliminary Observations on the Army's Implementation of Its
         Equipment Reset Strategies, GAO-07-439T (Washington, D.C.: Jan. 31, 2007), and Defense Logistics:
         Preliminary Observations on Equipment Reset Challenges and Issues for the Army and Marine
         Corps, GAO-06-604T (Washington, D.C.: Mar. 30, 2006).


GAO-08-257R Defense Logistics

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most