          Decision


          Matter of: DuRette Construction Company, Inc.

          File:       B-294379

          Date:       September 15, 2004

          Rob DuRette, DuRette Construction Company, Inc., for the protester.
          Byron W. Waters, Esq., United States Department of Agriculture, Forest Service, for
          the agency.
          Paul N. Wengert, Esq., and Michael R. Golden, Esq., Office of the General Counsel,
          GAO, participated in the preparation of the decision.
          DIGEST

          Although agency apparently disclosed potential proposal revision involving cost
          savings through use of smaller concrete blocks in construction project, which had
          been raised by protester during discussions, when conducting subsequent
          discussions with other competitors, even assuming that this disclosure was
          improper, the protester did not show competitive prejudice where neither protester
          nor awardee revised its proposal to utilize smaller concrete blocks.
          DECISION

          DuRette Construction Company, Inc. protests the award of a contract to Southeast
          Road Builders, Inc. for construction of the Thorne Bay Marine Access Facility (MAF)
          project, under request for proposals (RFP) No. R1O-05-04-34. DuRette argues that an
          innovative approach to performance, involving the use of smaller precast contract
          blocks in construction of the seawall bulkhead, was improperly disclosed to the
          awardee during discussions.

          We deny the protest.

          The Thorne Bay MAF is to be used for the transfer, sorting, and loading of logs onto
          barges for shipment from the Tongass National Forest. A portion of the project
          specifications required the construction of a seawall bulkhead using precast
          concrete blocks, described on accompanying drawings. RFP amend. 2 (drawing
          sheet 17 of 19).

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most