          Decision


          Matter of: Oregon Electric Construction, Inc. dba Integrated Systems Group

          File:       B-294279

          Date:       September 27, 2004

          Darin D. Honn, Esq., and Jason W. Alexander, Esq., Sussman Shank, for the
          protester.
          Mark G. Garrett, Esq., Department of Agriculture, for the agency.
          Susan K. McAuliffe, Esq., and Christine S. Melody, Esq., Office of the General
          Counsel, GAO, participated in the preparation of the decision.
          DIGEST

          Agency properly rejected bid as nonresponsive where qualification in bid cover letter
          rendered bid ambiguous; qualification made it uncertain whether bidder
          unequivocally offered to perform in accordance with terms of solicitation
          amendment.
          DECISION

          Oregon Electric Construction, Inc. dba Integrated Systems Group (Integrated)
          protests the rejection of its apparent low bid as nonresponsive under invitation for
          bids (IFB) No. R6-9-04-07, issued by the Department of Agriculture, Forest Service,
          for improvement of the Quinault wastewater collection and treatment facility in
          Washington. Integrated contends that the agency unreasonably determined that its
          bid cover letter rendered uncertain whether the firm intended to perform in
          accordance with the solicitation's requirements for operation and maintenance by
          the contractor of the wastewater treatment plant.

          We deny the protest.

          The IFB, issued on March 5, 2004, contemplated the award of a fixed-price contract
          for a base item (for improvements to the wastewater treatment facility) and two
          option items (for grinder pump station improvements and drain field expansion). In
          addition, the amended IFB called for the operation and maintenance of the
          wastewater treatment plant. Specifically, amendment No. 3 to the IFB provided that

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most