About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

B-287442.2 1 (2002-03-21)

handle is hein.gao/gaocrptaoav0001 and id is 1 raw text is: 




         G     A     0                                                 Comptroller General
             SIntegrity Reliability                                     of the United States
 ~ccountabthty Inert Rea iy
United States General Accounting Office            DOCUMENT FOR PUBLIC RELEASE
Washington, DC 20548                                  The decision issued on the date below was subject to a
                                                      GAO Protective Order. This redacted version has been
                                                      approved for public release.

          Decision

          Matter of: Kalman & Company, Inc.

          File:        B-287442.2

          Date:        March 21, 2002

          Daniel R. Weckstein, Esq., Walter T. Camp, Esq., and Michael L. Sterling, Esq.,
          Vandeventer Black, for the protester.
          Bernard J. Roan, Esq., and David A. Samuels, Esq., National Aeronautics and Space
          Administration, for the agency.
          Tania Calhoun, Esq., and Christine S. Melody, Esq., Office of the General Counsel,
          GAO, participated in the preparation of the decision.
          DIGEST

          Protest that contracting agency's evaluation of technical, past performance, and cost
          proposals was unreasonable is denied where the record shows that the evaluation
          was reasonable and consistent with the solicitation's stated evaluation criteria.
          DECISION

          Kalman & Company, Inc. protests the award of a contract to Analytical Services &
          Materials, Inc. (AS&M) under request for proposals (RFP) No. RFP4-00017, issued by
          the National Aeronautics and Space Administration (NASA) to obtain engineering
          and technical services (ETS) in support of flight research and development programs
          for NASA's Dryden Flight Research Center, located at Edwards Air Force Base,
          California. Kalman argues that the agency improperly evaluated technical, past
          performance, and cost proposals.

          We deny the protest.

          The ETS contract is the primary vehicle by which the Dryden research, projects,
          management operations, chief engineer's office, and public affairs/education/
          commercialization organizations obtain support for flight research projects, internal
          research and development, and various technical support functions. RFP Statement
          of Work (SOW) at 3. As a result, the SOW divides the technical requirements into
          four sections: research engineering support; management system support; chief
          engineer's office support; and public affairs, commercialization, education outreach
          (PACE) and history office support. Id. This acquisition combines the current ETS
          contract with two other Dryden contracts. The solicitation, issued as a small

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most