About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

B-287841 1 (2001-08-20)

handle is hein.gao/gaocrptamqw0001 and id is 1 raw text is: 




         G     A     0                                                Comptroller General
             SIntegrity Reliability                                    of the United States
 ~ccountabthty Inert Rea iy
United States General Accounting Office           DOCUMENT FOR PUBLIC RELEASE
Washington, DC 20548                                 The decision issued on the date below was subject to a
                                                     GAO Protective Order. This redacted version has been
                                                     approved for public release.

          Decision

          Matter of: LaBarge Products, Inc.

          File:       B-287841; B-287841.2

          Date:       August 20, 2001

          William H. Gammon, Esq., Moore & Van Allen, for the protester.
          Vera Meza, Esq., and Elizabeth Burt, Esq., U. S. Army Materiel Command, for the
          agency.
          David A. Ashen, Esq., and John M. Melody, Esq., Office of General Counsel, GAO,
          participated in preparation of the decision.
          DIGEST

          Agency reasonably excluded from the competitive range as unacceptable proposal
          with significant informational deficiencies.
          DECISION

          LaBarge Products, Inc. protests the rejection of its proposal as unacceptable under
          request for proposals (RFP) No. DAAE07-00-R-T056, issued by the U. S. Army
          Materiel Command (AMC), U. S. Army Tank-Automotive and Armaments Command,
          for acquisition of the Advanced Aviation Forward Area Refueling System (AAFARS).

          We deny the protest.

          The RFP provided for award of an indefinite-delivery/indefinite-quantity (ID/IQ)
          contract to continue production of the current AAFARS system, based on a revised
          performance-based purchase description, and furnish up to 375 AAFARS systems
          (and associated logistics support and training) over a period of 8 years. The
          AAFARS refueling system consists of a pumping system, filtration system, nozzles,
          hoses, couplings and ground rods; the system draws fuel from four 500-gallon fuel
          drums and provides filtered fuel at a rate of 55 gallons per minute (gpm)
          simultaneously to four nozzles located 100 feet apart. The AAFARS is used to refuel
          up to four helicopters in tactical locations when the refueling site is inaccessible to
          ground vehicles or urgency requires rapid air deployment.

          Award was to be made to the offeror whose proposal represented the best value to
          the government. The solicitation provided for proposals to be evaluated under
          three evaluation areas: (1) capability, including evaluation elements for ability to

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most