B-287066 1 (2001-03-30)

handle is hein.gao/gaocrptamon0001 and id is 1 raw text is: 




         G     A    0                                                 Comptroller General
             SIntegrity Reliability                                   of the United States
 ~ccountabthty Inert Rea iy
United States General Accounting Office
Washington, DC 20548



          Decision


          Matter of: C. Lawrence Construction Company, Inc.

          File:       B-287066

          Date:       March 30, 2001

          Doug R. Lawrence for the protester.
          Larry E. Beall, Esq., and Joseph A. Gonzales, Esq., Department of the Army, for the
          agency.
          Charles W. Morrow, Esq., and James A. Spangenberg, Esq., Office of the General
          Counsel, GAO, participated in the preparation of the decision.
          DIGEST

          In a solicitation providing for a tradeoff of past performance and price to determine
          the award, agency reasonably determined that awardee had more relevant and
          favorable past performance than did the protester and that this justified the
          relatively small price premium associated with accepting the awardee's proposal.
          DECISION

          C. Lawrence Construction Company, Inc. protests the award of a contract to Lord &
          Son Construction, Inc. under request for proposals (RFP) No. DACA01-01-R-0003,
          issued by the United States Army Corps of Engineers, for construction work.
          Lawrence contends that the Corps unreasonably evaluated its past performance.

          We deny the protest.

          The RFP, issued October 13, 2000, contemplated the award of a fixed-price contract
          to build a 24,000 square foot F-22 aircraft flight simulator and academic training
          facility at Tyndall Air Force Base, Florida. The RFP required construction of a single
          story steel frame building on spread footings with a concrete masonry unit exterior,
          a standing-seam metal roof, and interior rooms with limited raised flooring and
          computer room cooling. The estimated value of the project was between $5 and
          $10 million.

          The RFP provided for award considering past performance and price, which were
          weighted equally. Past performance was to be evaluated as a performance risk
          assessment of the offeror's specialized experience information determined by

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most