About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

B-283817.3 1 (2000-12-19)

handle is hein.gao/gaocrptakyk0001 and id is 1 raw text is: 


   4
 .        G    A     0                                                  Comptroller General

       Accountability * Integrity * Reliability                               United States
United States General Accounting Office                 DOCUMENT FOR PUBLIC RELEASE
Washington, DC 20548                                   The decision issued on the date below was subject to a
                                                       GAO Protective Order. This redacted version has been
                                                       approved for public release.

          Decision

          Matter of: Imaging Systems Technology

          File:        B-283817.3

          Date:        December 19, 2000


          Claude P. Goddard, Jr., Esq., and Hal J. Perloff, Esq., Wickwire Gavin, for the
          protester.
          Gregory H. Petkoff, Esq., John D. Inazu, Esq., and John C. Gatlin, Esq., Department
          of the Air Force, for the agency.
          Daniel I. Gordon, Esq., and John M. Melody, Esq., Office of the General Counsel,
          GAO, participated in the preparation of the decision.
          DIGEST

          Cancellation of solicitation based on a determination that in-house performance
          would cost the government less than contractor performance was improper where
          comparison of in-house and contractor performance was neither realistic nor fair.
          DECISION

          Imaging Systems Technology (IST) protests the cancellation of request for proposals
          (RFP) No. F04606-99-R-90052, issued by the Department of the Air Force for logistics
          support for the Programmable Indicator Data Processor (PIDP) air traffic control
          and landing system. The agency cancelled the solicitation based on a determination
          that performing the work in-house would result in cost savings. IST, the incumbent
          contractor, contends that the cancellation lacked a reasonable basis because the
          agency failed to conduct a realistic or fair comparison of the cost of in-house and
          contractor performance.

          We sustain the protest.

          The RFP, a total set-aside for small businesses, sought proposals to furnish all
          necessary resources required to provide logistics support for the PIDP system and
          peripheral equipment. The PIDP system is a standardized automated radar display,
          tracking, and flight data processing system used in the provision of air traffic control
          services at locations identified in the RFP, including dozens in the continental United
          States together with others as distant as Japan and Germany.

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most