 __Comptroller General
                                                                  of the United States
United States General Accounting Office           DOCUMENT FOR PUBLIC RELEASE
Washington, DC 20548                             The decision issued on the date below was subject to a
                                                 GAO Protective Order. This redacted version has been
                                                 approved for public release.

         Decision

         Matter of: Mid Pacific Environmental

         File:       B-283309.2

         Date:       January 10, 2000


         Richard B. Oliver, Esq., and Christopher B. McDavid, Esq., McKenna & Cuneo, for
         the protester.
         Karen E. Schools, Esq., Defense Logistics Agency, for the agency.
         Jacqueline Maeder, Esq., and Paul I. Lieberman, Esq., Office of the General Counsel,
         GAO, participated in the preparation of the decision.
         DIGEST

         Protest that agency failed to perform proper best value determination is denied
         where the source selection authority considered technical evaluations, past
         performance ratings and cost in his award determination and reasonably determined
         that the evaluated superiority of the highest technically rated proposal warranted
         payment of the associated cost premium.
         DECISION

         Mid Pacific Environmental protests the award of a contract to Willbros Operating
         Systems, Inc. under request for proposals (RFP) No. SP0600-R-0009, issued by the
         Defense Energy Support Center (DESC), Defense Logistics Agency to provide and
         operate an automated fuel dispensing facility at the U.S. Marine Corps Air Ground
         Combat Center, 29 Palms, California. Mid Pacific questions the propriety of the
         agency's evaluation of the awardee's past performance, and asserts that the resulting
         best value determination is flawed and inadequately documented.

         We deny the protest.

         The RFP, issued October 2, 1998, contemplated the award of a fixed-price contract
         for a 5-year base period with three 5-year option periods. RFP § L74 and amend. 8
         § B34.01(6). The RFP, as amended, required that the facility consist of metered fuel
         pumps capable of fueling a minimum of 50 vehicles (trucks or equipment) per hour
         with JP8 (aviation), diesel, or unleaded gasoline, and 8 track-type vehicles (tanks)
         per hour with JP8 or diesel fuel. RFP amend. 8, § B34.01(2). Associated fuel
         dispensing storage was to include tanks for the 3 grades of government-provided

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most