B-279638 1 (1998-07-02)

handle is hein.gao/gaocrptahtf0001 and id is 1 raw text is: 


oComptroller General
             of the United States
             Washington, D.C. 20548
             Decision




             Matter of: Federal Construction, Inc.

             File:       B-279638; B-279638.2

             Date:       July 2, 1998

             Abel Carreon for the protester.
             Robert E. Korroch, Esq., United States Coast Guard, for the agency.
             Susan K McAuliffe, Esq., and Christine S. Melody, Esq., Office of the General
             Counsel, GAO, participated in the preparation of the decision.
             DIGEST

             Agency properly rejected as nonresponsive bid that failed to include
             acknowledgment of a material solicitation amendment that affected contract
             performance by specifying the size and type of circuit breaker required by the
             agency, resolving solicitation ambiguity as to the actual circuit breaker required.
             DECISION

             Federal Construction, Inc. protests the rejection of its low bid as nonresponsive
             under invitation for bids (IFB) No. DTCGG1-98-B-QEE016, issued by the Department
             of Transportation, U.S. Coast Guard (USCG), for renovations to Chase Hall at the
             USCG Academy, New London, Connecticut. Federal's bid was rejected as
             nonresponsive because it did not contain an acknowledgment of amendment
             No. A0001, which the agency considered material. Federal contends that the
             amendment simply clarified solicitation terms and thus was not material; Federal
             asserts that its failure to acknowledge the amendment prior to bid opening should
             be waived as a minor informality.

             We deny the protest.

             The IFB, issued on February 13, 1998, was amended on March 6 to, among other
             things, add the following provision, regarding electrical wiring in the laundry room,
             to sheet 8 of 9 of IFB drawing No. CC-883-7050:

                   Contractor shall provide new 200-amp circuit breaker (3-phase, 4-wire,
                   60-cycles) for new Laundry Room Circuit, to be compatible with
                   existing General Electric (GE) switchgear. (Reference: GE breaker
                   #TFJ236200). Contractor shall provide all materials and fittings for a
                   complete circuit installation.


Amendment No. A0001 at 2.

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most