B-278076.2 1 (1998-01-20)

handle is hein.gao/gaocrptahmz0001 and id is 1 raw text is: 


oComptroller General
             of the United States
             Washington, D.C. 20548
             Decision




             Matter of: Kalex Construction & Development, Inc.

             File:       B-278076.2

             Date:       January 20, 1998

             Edward J. Kinberg, Esq., for the protester.
             Thomas W. Burt, Esq., and Larry E. Beall, Esq., Department of the Army, for the
             agency.
             Linda C. Glass, Esq., and Paul I. Lieberman, Esq., Office of the General Counsel,
             GAO, participated in the preparation of the decision.
             DIGEST

             1. Amendment is not material where it does no more than restate information
             already contained in the solicitation regarding the scope and quality of certain work.

             2. Contracting officer properly accepted bid that failed to acknowledge a
             solicitation amendment that was not material.
             DECISION

             Kalex Construction & Development, Inc. protests the proposed award of a contract
             to ABC Landclearing/Tri-State Design (ABC), under invitation for bids (IFB)
             No. DACA01-97-B-0082, issued by the United States Army Corp of Engineers for
             basewide landscaping and signage at Homestead Air Reserve Base, Florida. Kalex
             contends that ABC's bid should have been rejected as nonresponsive because it
             failed to acknowledge an amendment to the IFB.

             We deny the protest.

             The IFB, issued on August 5, 1997, stated that the work consisted of landscaping
             buffers, streetscaping, pedestrian spine with landscaping, security lighting and signs
             for buildings and roadway intersections. The IFB required offerors to perform all
             work and furnish all plant, labor, equipment, and materials required by the
             specifications and the drawings. With respect to the sodding requirement, the IFB
             provided that the work would consist of solid sodding with St. Augustine Floritam
             or Bahia Pensacola, as indicated on the contract drawings. The limits of sodding
             were also stated to be as required on the contract drawings. With respect to the
             lighting system, the IFB required that the lighting system be configured as specified
             by the drawings and that the system included all fixtures, hardware, poles, cables,
             connectors, adapters, and appurtenances needed to provide a fully functional
             lighting system. Amendment 0001, issued on August 25, revised the bid schedule

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most