B-277554 1 (1997-09-22)

handle is hein.gao/gaocrptagcu0001 and id is 1 raw text is: 


oComptroller General
             of the United States
             Washington, D.C. 20548
             Decision




             Matter of: ACC Construction Co., Inc.

             File:       B-277554

             Date:       September 22, 1997

             Karl Dix, Jr., Esq., Smith, Currie & Hancock, for the protester.
             D. Lee Roberts, Jr., Esq., Long, Weinberg, Ansley & Wheeler, for Dawson Building
             Contractors, Inc., an intervenor.
             William A. Hough, Esq., Department of the Army, for the agency.
             Wm. David Hasfurther, Esq., and Michael R. Golden, Esq., Office of the General
             Counsel, GAO, participated in the preparation of the decision.
             DIGEST

             Agency properly rejected low bid as nonresponsive where bidder failed to
             acknowledge with its bid a material amendment to an invitation for bids that
             substantially increased the bidder's performance obligations for construction of a
             parking area and resolved an ambiguity as to the dimensions required for
             construction of a vehicle washrack.
             DECISION

             ACC Construction Co., Inc. protests the rejection of its low bid under a Department
             of the Army invitation for bids (IFB) No. DACA21-97-B-0012, issued for construction
             work at the United States Army Reserve Center, Ft. Bragg, North Carolina. ACC's
             bid was rejected as nonresponsive because it did not contain an acknowledgment of
             amendment No. 0005, which the agency considered material. ACC contends that
             the amendment was not material and that the failure to acknowledge it should be
             waived as a minor informality.

             We deny the protest.

             The IFB was issued on March 13, 1997. Bids were opened on May 13. ACC's low
             bid of $10,158,401 was rejected after it was found not to contain an
             acknowledgment of amendment No. 0005. The agency considered the amendment
             to be material in view of its effect on the legal obligations of the contracting parties
             and the estimated $155,614 in additional costs associated with the revisions
             contained in the amendment.

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most