B-271869 1 (1996-07-30)

handle is hein.gao/gaocrptaegq0001 and id is 1 raw text is: 


Comptroller General
of the United States
Washington, D.C. 20548

Decision



Matter of: Heart of Dixie Machine & Fabrication Company, Inc.

File:        B-271869

Date:        July 30, 1996

John T. Jozwick, Esq., for the protester.
Robert E. Young, Esq., Department of the Navy, for the agency.
Behn Miller, Esq., and Christine S. Melody, Esq., Office of the General Counsel,
GAO, participated in the preparation of the decision.
DIGEST

1. Protest challenging award under solicitation for flexor refurbishing services on
the basis that the awardee did not, prior to award, demonstrate its compliance with
a solicitation requirement for manufacturer testing and certification of refurbishing
component's physical characteristics is denied since by its terms, this requirement
was a performance requirement, not a precondition to award.

2. Protest contending that solicitation failed to apprise offerors that award could be
made on the basis of initial proposals is denied since solicitation included a
reference to a Federal Acquisition Regulation (FAR) provision that contemplated
this possibility; to the extent the protester challenges the agency's use of the
predecessor version of the current FAR provision, the protest is untimely as this
was evident from the face of the solicitation but was not challenged until after the
solicitation closing time.

3. Post-closing time protest challenging agency's failure to evaluate offerors' past
performance is dismissed as untimely since the solicitation included no reference to
evaluation of past performance, and thus offerors clearly were on notice from the
face of the solicitation that past performance was not intended to be an evaluation
factor.

DECISION

Heart of Dixie Machine & Fabrication Company, Inc. (Dixie) protests the award of a
contract to Alabama Coastal Repair Company, Inc. under request for proposals
(RFP) No. N62604-96-R-7550, issued by the Department of the Navy for flexor
refurbishing services at the Naval Construction Battalion Center, Gulfport,
Mississippi. Dixie contends that the award to Alabama is improper because the
awardee failed to comply with one of the solicitation's certification requirements.


618730

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most