About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

B-417362.2 1 (2019-11-06)

handle is hein.gao/gaobaeaez0001 and id is 1 raw text is: 



GAOU.S. GOVERNMENT ACCOUNTABILITY OFFICE
441 G St. N.W.                                                 Comptroller General
Washington, DC 20548                                            of the United States
                                         .......................................................................................................................
                                            DOCUMENT FOR PUBLIC RELEASE
                                          The decision issued on the date below was subject to
Decision                                  a GAO Protective Order. This redacted version has
                                          been approved for public release.


Matter of:  Chromalloy Component Services, Inc.

File:       B-417362.2

Date:       November 6, 2019

William M. Weisberg, Esq., Law Offices of William Weisberg, for the protester.
Colonel Patricia S. Wiegman-Lenz, Esq., Michael J. Farr, Esq., and Waynette L. McKay,
Esq., Department of the Air Force, for the agency.
Michael P. Grogan, Esq., and Edward Goldstein, Esq., Office of the General Counsel,
GAO, participated in the preparation of the decision.
DIGEST

Protest challenging requirement in solicitation as impossible to meet is denied where
the record shows that the agency reasonably expected that offerors would be able to
meet the requirement.
DECISION

Chromalloy Component Services, Inc. (Chromalloy), of San Antonio, Texas, protests the
terms of request for proposals (RFP) No. FA8122-19-R-0001, issued by the Department
of the Air Force, for the remanufacture of F1 08 low pressure turbine assembly modules.
The protester contends that the solicitation includes a requirement that no offeror can
meet and is structured in a manner that will result in offerors submitting unbalanced
pricing.

We deny the protest.

BACKGROUND

The RFP, issued on January 16, 2019, under Federal Acquisition Regulation (FAR)
parts 12 and 15, contemplates the award of a fixed-price, indefinite-delivery,
indefinite-quantity contract, to be performed over a 1-year base period and four 1-year
option periods. Agency Report (AR), Tab 25, RFP amend. 8 at 1, 3-5. The Air Force's
requirement concerns the remanufacture of Air Force module 13/15 for use in the F1 08
engine. Id. at 73; Contracting Officer's Statement (COS) at 2. This module, part of the
low pressure turbine (LPT) major module in the F108 engine, converts hot gas pressure
and velocity into mechanical power to drive the fan rotor and booster assembly, and

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most