B-406812.2 1 (2012-08-28)

handle is hein.gao/gaobadozp0001 and id is 1 raw text is: 




   AL     G    A    O0                                                 Comptroller General
Bo      Accountability * Integrity * Reliability                        of the United States
  United States Government Accountability Office
  Washington, DC 20548



           Decision


           Matter of:  Bob Cummins Construction Company

           File:       B-406812.2

           Date:       August 28, 2012

           Gregory A. Henry, Esq., for the protester.
           William A. Lubick, Esq., U.S. Army Corps of Engineers, for the agency.
           Pedro E. Briones, Esq., and Guy R. Pietrovito, Esq., Office of the General Counsel,
           GAO, participated in the preparation of the decision.
           DIGEST

           Protester's proposal was properly rejected where agency reasonably determined
           that the bid guarantee was defective because the surety may not be liable in the
           event that the protester failed to furnish a required payment bond after contract
           award.
           DECISION

           Bob Cummins Construction Company, of Bradford, Pennsylvania, protests the
           rejection of its proposal under request for proposals (RFP) No. W911WN-12-R-
           0001, issued by the U.S. Army Corps of Engineers for construction services.

           We deny the protest.

           BACKGROUND

           The RFP provided for the award of a fixed-price contract for the construction of
           a new resident engineer office building at East Branch Lake in Elk County,
           Pennsylvania. RFP at 1. As pertinent here, offerors were required to submit a bid
           guarantee with their proposals for 20 percent of their proposed price, or $3 million,
           whichever was less. Id. at 13, 15. Offerors were informed that the contractor would
           be required to furnish performance and payment bonds within 10 calendar days
           after contract award.' Id. at 1. The RFP included standard FAR clause 52.228-1,

           1 The Miller Act requires contractors performing government construction contracts
           to post acceptable surety bonds to insure completion of the work and the payment
                                                                            (continued...)

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most