B-202901.2 1 (1981-08-17)

handle is hein.gao/gaobadjqt0001 and id is 1 raw text is: 





                                    4  THE COMPTROLLER GENERAL
              DECISION         21 4    OF THE UNITED       STATES
                                       W A S H f N G T O N, D. C. 20 5 4 e
                               VNITO~


              FILE: B-202901.2              DATE: August 17,.1981

              MATTER OF: Domar Buckle Mfg. Corp.--Reconsideration


              DIGEST:


                      Delay in'mail does not constitute good
                      cause basis under Bid Protest Procedures
                      to consider untimely protest on merits.
                      Once protest arrives late, any delay
                      that may have occurred after the receipt
                      is immaterial. Untimely protest against
                      correction of mistake in bid based on
                      bidder's worksheets does not present
                      significant issue for consideration under
                      Bid Protest Procedures; such issue has
                      been treated on merits previously.


                   Domar Buckle Mfg. Corp. (Domar) requests
              reconsideration of our decision in Domar Buckle Mfg.
              Corp., B-202901, May 21, 1981, 81-1 CPD 401. In that
              decision, we held the Domar protest to be untimely and
              not for consideration on the merits, since it was
              filed with our Office on April 14, 11 working days
              after Domar received notification that its identical
              protest to the contracting officer had been denied
              (initial adverse agency action). Our Bid Protest
              Procedures require a filing with our Office within 10
              working days of formal notification of the initial
              adverse agency action. 4 C.F.R. S 21.2(a) (1981).

                   Domar requests us to reconsider our decision
              because it believes that good cause exists for the
              consideration of the protest and that the protest
              raises issues significant to procurement practices
              and procedures. Our Bid Protest Procedures permit
              consideration o'i the merits of an untimely protest
              if either of these two exceptions exists. 4 C.F.R.
              § 21.2(c) (1981)


I

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most