B-194401 1 (1980-07-03)

handle is hein.gao/gaobadjbl0001 and id is 1 raw text is: 

                 74~

                                       THE COMPTROLLER GENERAL
               DECISION.          - , ! OF T-HE U N ITED    STATES
                                       WASH I N.GTON, 0. C. 20548



               FILE: B-194401                 ATE: July 3, 1980

               MATTER OF: Corps of Engineers, North Pacific Division--
           r,      r;a/be Overtime for Power Plant Employees7

               DIGEST: In 1967, Corps of Engineers, North
                        Pacific Division, and Columbia Power
                        Trades Council, representing wage
                        board employees at hydro-electric
                        power plants negotiated a double
                        ove-time provision in their agree-
                        merrt-. Double overtime was stopped
                        by agency following our decision
                        in 57 Comp. Gen. 259, February 3,
                        1978. In light of section 704
                        of Civil Service Reform Act which
                        overruled our decision, and although
                        wages are not negotiated, provision
                        for double overtime is preserved by
                        section 9(b) of Pub. L. 92-392.  /


                  Is double overtime pay authorized for wage board
A             employees of the U. S. Army Corps of Engineers who are
              covered by the special Pacific Northwest Regional
              Power Rate Schedule? This question is presented by
              Mr. R. Loschialpo, Chief, Office of Personnel, Office,
              of the Chief of Engineers, Department of the Army.

                  For the reasons stated below, we conclude that
             double overtime is authorized for the wage board
             employees of the Army Corps of Engineers who are
             covered by the special Pacific Northwest Regional
             Power Rate Schedule.

                  The letter rqustng a decision from the Corp
             of Engineers provides us with the following background1)
             information. On January 30, 1956, the Army-Air Force
             Wage Board (now the Department of Defense Wage Fixing
             Authority) authorized all wage board employees at hydro-
             electric power plants operated by the Corps of Engineers,
             North Pacific Division, to be paid in accordance with
             the provisions of the special Pacific Northwest Regional
             Power Rate Schedule. The schedule was based on the wage

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most