B-194853 1 (1979-09-21)

handle is hein.gao/gaobadhpw0001 and id is 1 raw text is: 


4


DECISION


           THE   COMPTROLLER GENERAL
''<. OF THE UNITED STATES
            WASHINGTON,  .C. 20548


FILE:  B-194853                     DATE:  September 21, 1979

MATTER OF: Rust Tractor Company        w Q     (L


DIGEST:


ayment   mey-be-made to & contractr for repair
work  to Government equipment eve  Ugh   formal
contracting  procedures were not followed because
Government  received the benefit and has specifi-
cally  ratified the transaction. Appropriation
available  at time contractor was authorized to
and  actually performed the repair work should
be  charged, irrespective of fiscal year in which


            the transaction was ratified.


     A certifying officer for the Bureau of Indian Affairs (BIA) in
Albuquerque, New Mexico, has requested an advance decision from our
Office as to whether he may certify a voucher in the amount of
$22,875.36 to pay the Rust Tractor Company (Rust) for its services.
He questions the propriety of making such a payment because formal
procurement procedures were not followed and the transaction with
Rust was not properly authorized.

     Apparently, the instant situation aose as a result of a mis-
understanding between personnel at the Ramah-Navajo Agency's Branch
of Roads (Agency) and Rust. When repair work was needed for a Cat-
erpillar Scraper, an estimate prepared by Rust was verbally quoted
to the agency as $6,500. The Agency's branch chief authorized Rust
to proceed with the repair work. Agency personnel did not realize
until receiving Rust's invoices for the work that the quoted estimate
was for labor only and did not cover parts. Rust was uncertain when
it prepared the estimate what parts would actually be necessary.

     The Agency had indicated that it would never have permitted Rust
to proceed with the repair work if it had known that the total cost
of the work was $22,875.36, since this amount exceeds its delegated
procurement authority. However, the Agency has certified that the
cost of repairing the equipment was valid and proper, that the re-
pair work was necessary to place the equipment in operative condition
and that the repair work has extended the useful life of the equip-
ment for at least five additional years. The cost of replacing the
equipment instead of repairing it would have been three times the
total cost of the repair. The Agency also informs us that if pro-
per procurement procedures had been followed, Rust would have re-
ceived the authorized contract to do the repair work since it was

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most