B-189926 1 (1977-12-27)

handle is hein.gao/gaobadfni0001 and id is 1 raw text is: 

I





                                          O S  THE COMPTROLLER CWNERAL
                    DECIBIN   101          OF THE UNyIanHAR
                                      C      / WASHINGTON, D.C. 20540
                                      'NT


                    FILE:    B-189926                DATE:  December 27, 1977

           -t       IMATTER  OF:    Williams and Company, Inc.
           C)

                    DIGEST:

                       Request for modification of contract price due to alleged
                       error in bid, claimed after award, is allowed, because
                       contracting officer, in discharging bid verification duty,
                       failed to specifically point out discrepancy in contractor's
                       bid.

                       On the basis of a mistake in bid alleged after award,
                    Williams and Company, Inc. (Williams) requests modifination
                    of contract No. DACW27-77-C-0021 awarded ,o Williams by the
                    Army. Corps of Engineers (Army) for varied quantities of stain-
                    less steel pipe (Items No. I and No. 2), stainless steel elbows
                    (Items No. 3 ard No. 4), and stainless steel flanges (Items No.
                    5 and No. 6). In bidding Items No. 3 and No. 4, Williams states,
                    it mistakenly bid less expensive cast fittings instead of the more
                    expensive wrought fittings called for under the solicitation as
                    amended.

                       The solicitation, as originally issued. required that;

                       rai11 staihless steel pipes, elbows and flanges
                       ** * he ASTM Standard A 312 Cseamless and
                       welded austenitic SS pipe'. Grade TP 304-
                       Schedule 40.

                    Upon receipt of the solicitation Wi)iams noticed that with regard
                    to Items No. 3 and No. 4 there was no indication in the solicitation
                    as to whether they were to be 150-pound fittings or more heavily
                    rated fittings. This discrepancy was reported to the Army. The
                    Army subsequently issued an amendment to the solicitation which
                    among other things addressed the issue which Williams had raised.
                    The amendment as issued consisted of two pages and an attachment.
                    The attachment was to be rubstituted fur the above nuated specifi-
                    cation and read as follows:

                                 SPECIFICATIONS  FOR
                                 STAINLESS  STEEL  PIPE,
                                   ELBOWS,  FLANGE

                       Stainless Steel Pipe [Items No. I and No. 2]



                                                   -1-

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most