B-189532 1 (1977-11-08)

handle is hein.gao/gaobadfhl0001 and id is 1 raw text is: 





                                                         L. Kozlnkoveki
                               /A                                     FL I
                               THE  COMP.ROLLER DENERAL
  cmCIs31N       (½. OF             THE    UNITED       UTATEE
                               WASHINGTON. rs. C. 20548



 FILE:        3-189532               DATE: November 8,   1977

 MATTER OF:         American Electrtc Construction Co., Inc.


 DIfEST:

 1. Protester's telephone conversation prior to bid opening
    concerning allegedly restrictive IFB specifications was
    a timely protest to agency since conversation covered
    subject matter of protest.  Therzfore, protest .sde to
    GAO within 10 Tforking days of bid opening (initial
    adverse agency actian) is timely. However, new conten-
    tion raised aftar bid opening is untimely and not for
    consideration.

2.  Specification in'IFB for -electrical switchgear will no:
    be questioned by GAO since on basis of existing record
    it cannot be concluded that specificationsawere impossible
    to meet and not in accurdance with actual needs of con-
    tracting agency.

    American  Elect:ric Construction Co., Inc. (American), protests
against the awaLd of Project No. 402-047 at the Veterans Adminiutration
Center, Togus, Maine.  The bases of American's protest are that the
specifications for the electrical switchgear cannot be met and that
channeling under the existing high voltage transformer section, while
the above is energized, violates safety requirements.

     Since Amer~can did not file its protest with this Office until
after bid opening, the VA questions che tireliness of the protest.
The record reflects that an employee of American telephonically con-
tacted the Office of the contracting officer regarding the solictation
prior to bid opening and was referred to the Project Engineer.
American then contacted-the Project Engineer and asked for clarification
on the electrical switchgear. The VA does not consider the telephone
conversation to be a protest and feels the protest by American to this
Office is untimely as having been filed after bid opening.

     The proper time to protest a defective solicitation provision
under our Pid Protest Procedures is prior to bid opening. 4 C.9.R. 5
20.2(b)(1) (19/6).  If a protest is timely filed initially with the
contracting agency, any subsequent protest to this Office will be
considered provided, inter alia, that the protent is filed with GAO
within 10 working days of formal rotification of actual or constructLve
knowledge of initial adverse agency action.

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most