                                            THE  COMPTROLLER GRNERAL
               DECISION .                 .FOP   THE umira          STArUs
                                            WABHINGTON, D.C. 2054t)




               FILE:     B-190311                 DATE:   October 21, 1977

               MATTER   OF:       Rothwell Brothers, Inc.
C1

              DIGEST:

                   Failure by bidder to acknowledge amendment increasing
                   minimum wage rates renters bid ncnresponsive, since
                   de minimus doctrine ia inapplicable and failure is
                   material deviation which is not subject to waiver,
                   notwithmrandins fact that bidder would be paying same
                   or higher wage rates under union labor agreement,
                   because acceptance of bid in form it exists at time
                   of bid opening would not result in contract contain-
                   ing statement of mJnimum wage rates to be paid as
                   required by Davis-Bacon Act.


                   By letter of 'September 27, 1977, the contracting officer at
              the Veterans Administratiun (VA) Hospital, Cincinnati, Ohio,
              requested our views in regard to a protest lodged by Rothwell
              Brothers, Inc. (Rothwell), against the rejection of its low bid
              and the proposed awrard of a contract to the next low bidder for
              furnishing and installing an automatic transfec switch to an
              existing emergency ,enerarar at the 7A Nursing Home at Fort Thomas,
              Kentucky.

                   Rothwell's bid was rejected for failure to acknowledge receipt
              of amendment No. 1. The amendment incorporated a new Davis-Bacon
              wage determination which appeared in the Federal Register aftec
              the sclicitation was issued. Rothwell's bid price was $8,382 while
              the bid price of the second low bidder was $9,358, a difference of
              $976.  In its protest to the VA, Rothwell argues that its bid was
              valil because it is a. union contractor and always pays prevailing
              wages and had the contracting officer contacted it, he would have
              discovered that its bid included the prevailing wage rates.

                   The contracting officer states that the Labor on this
              project is -almost exclusively electrician and the wage rate for
              that trade was increased by the amendrent by $0.55 per hour, which
              is more than 4 percent above the electricians wage rate originally
              contained in the solicitation. The contracting officer further
              advises that the amendment added $170.50 to the cost of the project,













                                      I                                                    *

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most