About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

B-404642 1 (2011-03-21)

handle is hein.gao/gaobadbtf0001 and id is 1 raw text is: 


   JiL
   AL

A     ,   G    A    O                                                   Comptroller General
        Acc untabiity * Integrity * Reliability of the United States
 United States Government Accountability Office    DOCUMENT FOR PUBLIC RELEASE
 Washington, DC 20548
                                                      The decision issued on the date below was subject to a
                                                      GAO Protective Order. This redacted version has been
                                                      approved for public release.
          D  e c  is io n                            ...........................................................


          Matter  of:  Andritz Hydro Corp.

          File:        B-404642

          Date:        March 21, 2011

          R. Lee Mann III, Esq., and Daniel B. Swaja, Esq., Kilpatrick Stockton LLP, for the
          protester.
          James M. Pakiz, Esq., and Thomas J. Morrissey, Esq., Department of the Army, Corps
          of Engineers, for the agency.
          Susan K. McAuliffe, Esq., and Edward Goldstein, Esq., Office of the General Counsel,
          GAO,  participated in the preparation of the decision.
          DIGEST

          Protest challenging agency's evaluation of protester's technical proposal is denied
          where record shows  evaluation was reasonable and consistent with terms of the
          solicitation.
          DECISION

          Andritz Hydro Corp., of Charlotte, North Carolina, protests the evaluation of its
          proposal, and the award of a contract to ABB, Inc., of Saint-Laurent, Quebec,
          Canada, under request for proposals (RFP) No. W9128F-10-R-0043, issued by the
          Corps of Engineers for the supply and installation of eight excitation systems for the
          Fort Randall Dam Power  Plant in South Dakota. Andritz contends that the agency
          did not reasonably evaluate its technical proposal.

          We  deny the protest.

          The RFP, issued on July 29, 2010, contemplated the award of a fixed-price contract
          for the design, manufacture, installation, commissioning and testing of eight digital
          excitation systems for generators at the Fort Randall Dam Power Plant, including the
          removal of existing analog exciters, concrete pads and associated equipment. Award
          was to be made to the firm that submitted the proposal determined to represent the
          best value to the government considering technical factors and price. RFP at 59 and
          63, Statement of Work, Technical Specification 01 11 10 1.1.

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most