About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

B-401844 1 (2009-12-04)

handle is hein.gao/gaobadbgm0001 and id is 1 raw text is: 




         ,G    A     O                                                Comptroller General
LXn ,  Accountability * Integrity * Reliability                        of the United States
United States Government Accountability Office    DOCUMENT FOR PUBLIC RELEASE
Washington, DC 20548                                 The decision issued on the date below was subject to a
                                                     GAO Protective Order. This redacted version has been
                                                     approved for public release.

          Decision

          Matter  of: METAG   Insaat Ticaret A.S.

          File:       B-401844

          Date:       December   4, 2009

          James H. Roberts III, Esq., Van Scoyoc Kelly PLLC, for the protester.
          James D. Stephens, Esq., U.S. Army Corps of Engineers, for the agency.
          Paula A. Williams, Esq., and Ralph 0. White, Esq., Office of the General Counsel,
          GAO, participated in the preparation of the decision.
          DIGEST

          Protest challenging agency's evaluation is denied where the record supports the
          reasonableness of the evaluations.
          DECISION

          METAG   Insaat Ticaret A.S. (METAG) of Ankara, Turkey protests the award of a
          contract to Serka Insaat Ve Ticaret A.S. (Serka) of Istanbul, Turkey under request for
          proposals (RFP) No. W912ER-09-R-0004, issued by the Department of the Army,
          Army Corps of Engineers, for design and construction services. METAG argues that
          the agency's evaluation and its subsequent award to a significantly higher-priced
          offeror were improper.

          We deny the protest.

          On November  13, 2008, the Corps issued this RFP for a contractor to design and
          construct a strategic airlift ramp and hot cargo pad at the Manas Air Base in
          Kyrgyzstan. The solicitation contemplated award of a fixed-price contract to the
          responsible offeror whose proposal was most advantageous to the government, price
          and other factors considered. RFP at 6. The RFP identified the following evaluation
          factors which were of equal importance: (1) price; (2) management and technical
          (with subfactors for management capabilities, technical capabilities, and
          subcontracting); (3) experience (with subfactors for design experience and
          construction experience); and (4) past performance (with subfactors for prime
          contractor past performance and subcontractor past performance). Id. at 8-13.
          Under the non-price factors and subfactors, proposals were to be rated as either
          outstanding (0), good (G), acceptable (A), marginal (M), susceptible to being made
          acceptable (SA), unacceptable (U), or neutral (N). Id. at 7.

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most