RCED-84-113 1 (1984-03-22)

handle is hein.gao/gaobabelk0001 and id is 1 raw text is: 





BY THE COMPTROLLER GENERAL



Report To The Congress


OF THE UNITED STATES




Status Of The Great Plains Coal

Gasification Project




Construction of the Great Plains coal gas-
ification plant in North Dakota was 95
percent complete and only about 2 weeks
behind schedule as of November 30, 1983.
Cumulative project costs were less than
originally estimated for this date.

Due to a drop in forecasted energy prices,
Great Plains, in September 1983, projected
that plant operations could result in large
after-tax losses and negative cash flows for
the sponsors. Great Plains notified the
Department of Energy that it was consider-
ing terminating its participation in the
project in the absence of additional federal
assistance. In this regard, additional assist-
ance in the form of price guarantees for the
project's synthetic natural gas are being
considered by the U.S. Synthetic Fuels
Corporation.














          ..                                            GAO/RCED-84-113
 SMARCH 22, 1984
 71 :

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most