About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

LCD-78-422A 1 (1978-12-14)

handle is hein.gao/gaobaayhj0001 and id is 1 raw text is: 



DOCURENT RESV3HR


07931 - [C3528616]
Army's Requirements for War Reserve Materiel Can B% Reduced
without Impairing Combat Effectiveness. LCD-78-422A; B-133396.
December 14, 1978. 73 pp. + appendix (1 pp.).
Report to Sen. John C. Stennis, Chairman, Seiate Committee on
Appropriations: Defense Subcommittee; by Elmtr B. Staata,
Comptroller General.
Unclassified version of a classified report.
Issue Area: salance of War Reserves, Propositioned Stocks, and
     the Industrial Base. (806).
 Contact: Logistics and Communications Div.
 Budget Function: National Defense: Department of Defense -
     Military (except procurement 6 ccntracts) (051).
 Orqanization Concerned: Department of Defense, Department of the
     Army.
 Conqressional Relevance: House Committee on Armed Services;
     Senate Committee on Armed Servicis. Sen. John C. Stennis.

          War Laserve materiel is now prestocked, and reserve
 requirements are based on ntudies of enemy threats and
 capabilities. At the end of fiscal year 1978, the &ray repor-ad
 -a $1.7 billion deficiency in war reserve stock fund items, th
 major deficiencies in clothing and textile items and avlat:' )n
 spare parts. Findings/conclusions: .e this deficiency ve:
 valid, it would seem to leave the Army unprepared for an reed
 conflict. However, the reported requirements and deficie' ies
 are overstated because of a number of assumptions and f ;tors,
 such as: incongruities in logistics planning for var rt ervd
 stock fund items; the Ary's spare parts requirements aich are
 based on outmoded, maximum delivery times while the f -ing-hour
 proqram is based on rapid delivery of helicopters; d, iciencies
 in the Army's high-priority stocks which are preposialoned for
 ready mobilization while the Defense Logistics Agency has some
 of the same types of items .'-- lower priority inventories; and
 problems with requirements gor chemical protective clothing. A
 recent Secretary of Defense directive limits procurement of war
 reserve items to satisfy needs for only one-half the days ix the
 total planning scenaric period, but the Army includes safety
 levels and residual force quantities as early mobilization
 requirements which tends to unnecessarily increase requirements.
 Recommendations: The Secretary of Defense should: limit the
 Army's war reserve stockage objective to be consistent with the
 direction liven to the DLA; direct that wartime safety level
 factors be eliminated from equipment computations; require the
 Army to coordinate its airltft requirements with the ilitaryr
 Airlift Command and to consider attrition and comat damage Vo
 achieve more accurate projections of requirements; require the
 Army to limit total repair cycle time for reparable items to
conform to the planning scenario and use more realistic sLipping
times and distribution methods to compute requirements; seek

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most