LCD-78-401 1 (1977-10-05)

handle is hein.gao/gaobaayan0001 and id is 1 raw text is: 



*                       /THE COMPTROLLER GENERAL
        DECISION •                   OF THE UNITED STATES
                             o       WASHINGTON. D.C. 20548


                                                               coolI

        FILE: B-183235                     DATE: November 6,1975

        MATTER OF:      Air Products and Chemicals, Inc.


        DIGEST:                                               LMi74

        1. Prospective subcontractor's complaint against subcontract
           awarded under Federal grant is for consideration since
           prime contractor awarded subcontract in question for the
           grantee.

        2. Purpose of power cost clauses in bidding documents for
            contract awarded under Federal grant is to enable grantee
            to ascertain as precisely as possible its total costs for
            proposed subcontract and to establish base for possible
            imposition of financial penalty in event power costs are
            exceeded.

        3. Since power consumption figures are material only to
           determination of grantee's ultimate costs and because
           any deviation from prescribed figures actually affects only
           determination of whether given bid will be most financially
           advantageous to grantee, irregular power consumption figures
           in bid otherwise appearing most financially advantageous
           should not be regarded as making bid nonresponsive where
           bid, as adjusted for irregularities by engineering consultant,
           is still low.


                                   BACKGROUND

            On November 21, 1974, the cities of Littleton and Englewood,
        Colorado, opened bids for the construction of a wastewater treat-
        ment plant which was to be financed in significant part by Federal
        grant funds made available by the Environmental Protection Agency
        (EPA). The apparent low bidder for the general construction contract
        was the Centric Corporation (Centric).

            Centric's bid contained three subcontractor bids from Air Products
        and Chemicals, Inc., Union Carbide Corporation, and FMC Corporation
        for the design, engineering and construction of the oxygen generation
        and dissolution supply subsystem for the plant.


-1-

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most