About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

B-178813 1 (1973-07-13)

handle is hein.gao/gaobaacwr0001 and id is 1 raw text is: a



                           COMPTROLLER GENERAL OF THE UNITED STATES
                                     WAL1IMdTCI. CC. ZOZ4I.


            UW-170813JUL13 1973


            The Ionorable Donald e. Johnson
            Administrator, Veteraas Admiuistration

            Dear Hr. Johnson:

                Reference is vade to letter 1340 datnd Hay 31, 1973, with
           enclosures, frou the Uirector, Supply Gervica, requesting a deciaton
           as to the action to be taken concerning an error allogied by the Itarino
           Conutruction Company to have beon maiei in t bid upon which contract
           lo. V695C-756 was based,

                The invitation roquested bid, to provide all labor, niteria',,
            toola  d uquipriot necessary to derolieh end renove fcftin3 buair
            and porch ntructurer and porform nll construction, repair and sito
            modification work of the south elevation, Lutilding 2, VA Center, t'ood,
            Wisconsin, Of the oix bids rocoivod, the low bid woan oubirtted by
            Itarino In the wount of $57,900. The -4thor bids vnre $6,800,$ 67,443,
            $69,900, $73,900 and $06,029, Tho Govdrnnont eltitonto for the work
            wvz $56,203.

                Altor award of tho contract,'farin2 4leod that tho$57,900
           bid price gras for the CGnova.L Conntructicn and tid not ctmtain any-
           thing for the 'Iochanical Tradoes portion of the vork that included
           plumbing, fire protection and eloctri=l work.  A price quotation
           obtained by the contractor after the award cf the tontract netimated
           the mechanical trades at $4v400, which thoc ontractor seaks to racover.

                .he Director, Supply Service, rweco~nded relief for tha contrcctor
           on theihauls that tho contracting, officer should have be.n on notice
           of possiblo orror sinco the average of the oecond, third end fourth
           low bids is 17.6 percent higher titan the loi 'bid and the contracting
           officor was tmrue that Hiarino had nevor performed a contract for t1h
           Federal Govarnncat.

                knevor, there wan no arror apparent on the face of the Marino
           bid. Insauch as the Government estimate was $1,700 les thnt tho lo,
           bid, the contracting officor would not have bocn on notice of r~ho
           likelihood of an *rror, notw thstanding he average of the next throe
           bid  s 17.6 percent hier thant the Iwo bid. &-177926, April 19,
           1973s The ec:eptmnco of tJe lot bid onnurouted a binding and Vilid
           contract in the circentmicu chic fhed ie lhtsand ulubilitt1os
           of tka  rtios. b-1711336, ay 10, 1973.

                 ', i
                        Q933

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most