Coast Guard Waterways Commerce Cutter (WCC) Program:

Background and Issues for Congress


Introduction
The Coast Guard's Waterways Commerce Cutter (WCC)
program envisages procuring 30 replacements for the Coast
Guard's 35 aging river buoy tenders (WLRs), inland
construction tenders (WLICs), and inland buoy tenders
(WLIs). The Coast Guard wants to have the first new WCC
be in service by 2025. On October 5, 2022, the Coast Guard
awarded a contract to Birdon America, Inc. of Denver, CO,
to build up to 16 WLRs and 11 WLICs. The Coast Guard's
proposed FY2024 budget requests $98.0 million in
procurement funding for the WCC program.

Terinology
Cutters are Coast Guard vessels that are more than 65 feet
long and have accommodations for a crew. (Those less than
65 feet long are called boats.) Waterways refers here to the
intra-coastal waterways along the U.S. East and Gulf
coasts, and to U.S. inland waterways such as the
Mississippi River. Tenders are vessels whose primary
mission is to maintain or repair something. Coast Guard
tender designations begin with WL, meaning Coast Guard
vessel (W) and tender (L). (The W in the acronym WCC,
however, stands for waterways.)

WCC Missions
WCCs  perform three primary missions under the Coast
Guard's statutory role of providing aids to navigation
(ATON):  river buoy tending; inland construction tending
(which involves driving and removing piles and erecting
and repairing range towers and major lights); and inland
buoy tending. WCCs are used for maintaining more than
28,200 marine aids to navigation on 12,000 miles of inland
waterways on which 630 million tons of cargo move each
year. Additional WCC missions include search and rescue
(SAR), marine safety, marine environmental protection, and
ports, waterways, and coastal security.

Existing   Waterways Cutters
The Coast Guard's 35 existing WCCs-including 18
WLRs,  13 WLICs, and 4 WLIs-were  built to nine
different designs and are now generally old or very old,
having been commissioned into service in 1990-1991 (2 of
them), 1976 (4), 1960-1970 (25), 1954 (2), and 1944-1945
(2).

Geographic Distribution
As of 2019, the 18 WLRs were based at cities along the
Mississippi and other inland rivers in Alabama, Arkansas,
Illinois, Iowa (two cutters), Kentucky (two cutters),
Mississippi (three cutters), Missouri, Nebraska, Oklahoma,
Pennsylvania, and Tennessee (four cutters). Although these
locations are in the central and eastern United States, the


rivers in question are referred to by the Coast Guard as the
western rivers.

As of 2019, the 13 WLICs were based at cities along the
U.S. East and Gulf coasts in Alabama, Florida (three
cutters), Louisiana (two cutters), Maryland, North Carolina,
South Carolina, Texas (three cutters), and Virginia. As of
2019, the four WLIs were based at locations in Alaska,
Michigan, Oregon, and North Carolina.

Rationale for Building New WCCs
The Coast Guard states in its FY2024 budget submission
that it wants to replace the 35 existing waterways cutters
with new WCCs  because [i]n addition to age concerns and
the associated equipment obsolescence issues, the legacy
fleet presents other sustainment challenges, including
hazardous materials stemming from the use of asbestos and
lead paint during construction of these assets. Outdated
technology and vessel designs have also led to crew safety
concerns, maintenance cost increases, and non-compliance
with environmental regulations. Finally, legacy vessel
configuration does not allow the assignment of mixed
gender crews in accordance with the Coast Guard's
workforce goals.

WCC Prograrm

Program   Initiation and Name
The WCC  program was initiated in the Coast Guard's
FY2018  budget submission. It was earlier called the Inland
Waterways and Western Rivers Tender (or Cutter) program.

Acquisition Strategy
The Coast Guard wants to replace the 35 existing waterway
commerce  cutters with 30 new WCCs, including 16 WLRs,
11 WLICs, and 3 WLIs. The Coast Guard states

    The [16] River Buoy Tender [WLR] and [11] Inland
    Construction Tender [WLIC]   variants will be
    acquired on  one contract; these variants will
    maximize commonality with notable exceptions for
    hull length, working  deck layout, and  deck
    equipment, including the crane.
    The  [3] Inland Buoy Tender[s] [WLIs] will be
    acquired separately from the other two variants. In
    June 2021, the WCC  Program  began partnering
    with the U.S. Army Corps of Engineers Marine
    Design Center, which has experience with similar
    acquisitions, to develop a Government-led design
    for the Inland Buoy Tender variant. The Inland
    Buoy Tender will be contractor-built.


0

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Short-term subscription options include 24 hours, 48 hours, or 1 week to HeinOnline.

Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most