About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline

1 (April 23, 2003)

handle is hein.crs/crsmthabbmh0001 and id is 1 raw text is: 
                                                                 Order Code  RS21391
                                                                 Updated April 23, 2003



 CRS Report for Congress

               Received through the CRS Web



           North Korea's Nuclear Weapons:
                   How Soon an Arsenal?

                           Sharon  A. Squassoni
                      Specialist in National Defense
               Foreign Affairs, Defense  and Trade  Division

Summary


     In December 2002, North Korea ended the 8-year-old freeze on its nuclear program
 by dismantling monitoring equipment, expelling inspectors and restarting operations at
 its plutonium production facilities. The CIA has assessed that North Korea could
 produce 5-6 weapons by mid-2003, in addition to 1 or possibly 2 weapons it might
 already have. North Korea restarted two key facilities in March 2003. This report
 describes steps in producing plutonium-based nuclear weapons and potential signs of
 North Korean activities. It will be updated as events warrant.

 Background

    In the early1980s, U.S. satellites tracked a growing indigenous nuclear program in
North Korea. North Korea's small reactor at Yongbyon (5MWe), capable of producing
about 6kg of plutonium per year, began operating in 1986.1 Later that year, U.S. satellites
detected high explosives testing and a new plant to separate plutonium (a necessary step
before turning the plutonium into metal for a warhead). In addition, the construction of
two larger reactors (50MWe at Yongbyon and 200MWe   at Taechon) added to the
mounting evidence of a serious, clandestine effort. Although North Korea had joined the
Nuclear Nonproliferation Treaty in 1985, nuclear safeguards inspections began first in
1992. Those inspections raised questions about how much plutonium North Korea had
produced covertly that still have not been resolved. In 1994, North Korea signed the
Agreed Framework with the United States, agreeing to freeze its plutonium programs and
eventually dismantle them in exchange for several kinds of assistance.2 Western
intelligence agencies at that time estimated that North Korea had produced an amount of




1 5MWe is a power rating for the reactor, indicating that it produces 5 million watts of electricity
per day (very small). Reactors are also described in terms of million watts of heat (MW thermal).
Although the reactor was optimized to produce plutonium, and is not connected to any electricity
grid, North Korea has always referred to it by the 5MWe rating.
2 See CRS Issue Brief 1B91141, North Korea's Nuclear Weapons Program.

       Congressional  Research   Service +  The Library of Congress

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Short-term subscription options include 24 hours, 48 hours, or 1 week to HeinOnline.

Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most