S. Rept. 115-311 1 (2018-07-31)

handle is hein.congrecreports/crptxabse0001 and id is 1 raw text is: AUTHENTICATEO
U.S. GOVERNMENT
INFORMATION
       Op














                                                              Calendar No. 536

                    115TH CONGRESS                SEAEREPORT
                        2d Session  J             SENATE                    115-311







                        J. BENNETT JOHNSTON WATERWAY HYDROPOWER
                                        EXTENSION ACT OF 2018



                                        JULY 31, 2018.-Ordered to be printed



                       Ms. MURKOWSKI, from the Committee on Energy and Natural
                                     Resources, submitted the following


                                              REPORT

                                              [To accompany S. 1142]

                              [Including cost estimate of the Congressional Budget Office]

                      The Committee on Energy and Natural Resources, to which was
                    referred the bill (S. 1142) to extend the deadline for commencement
                    of construction of certain hydroelectric projects, having considered
                    the same, reports favorably thereon with an amendment in the na-
                    ture of a substitute and recommends that the bill, as amended, do
                    pass.

                                                AMENDMENT

                      The amendment is as follows:
                      Strike all after the enacting clause and insert the following:
                    SECTION 1. SHORT TITLE.
                      This Act may be cited as the J. Bennett Johnston Waterway Hydropower Exten-
                    sion Act of 2018.
                    SEC. 2. EXTENSION.
                      (a) IN GENERAL.-Notwithstanding the time period specified in section 13 of the
                    Federal Power Act (16 U.S.C. 806) that would otherwise apply to Federal Energy
                    Regulatory Commission project numbers 12756, 12757, and 12758, the Commission
                    may, at the request of the licensee for the applicable project, and after reasonable
                    notice, in accordance with the good faith, due diligence, and public interest require-
                    ments of that section and the procedures of the Commission under that section, ex-
                    tend the time period during which the licensee is required to commence the con-
                    struction of the applicable project for up to 3 consecutive 2-year periods from the
                    date of the expiration of the extension originally issued by the Commission.
                      (b) REINSTATEMENT OF LICENSE.-If the time period required for commencement
                    of construction of a project described in subsection (a) has expired prior to the date
                    of enactment of this Act-
                        79-010

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most