B-290427 1 (2002-08-09)

handle is hein.gao/gaocrptaofo0001 and id is 1 raw text is: 




          G    A     0                                                 Comptroller General
Accountability * Integrity* Reliability                                of the United States
United States General Accounting Office
Washington, DC 20548



          Decision


          Matter of: Gemmo Impianti SpA

          File:        B-290427

          Date:        August 9, 2002

          Claudio Pilotto for the protester.
          J. Page Turney, Esq., and Robert E. Little, Jr., Esq., Department of the Navy, for the
          agency.
          Henry J. Gorczycki, Esq., and James A. Spangenberg, Esq., Office of the General
          Counsel, GAO, participated in the preparation of the decision.
          DIGEST

          Agency's source selection decision is unreasonable where the evaluation supporting
          the cost/technical tradeoff selection decision contains material defects under two of
          the three technical factors, and the tradeoff analysis is based on an erroneous
          assumption about the relative price difference.
          DECISION

          Gemmo Impianti SpA protests the award of a contract to Penauille Italia SpA under
          request for proposals (RFP) No. N33191-02-R-0402, issued by the Department of the
          Navy, Resident Officer in Charge of Construction (ROICC) Southern Italy, for
          various services at the Naval Support Activity, Naples, Italy. Gemmo protests the
          agency's evaluation and source selection decision.

          We sustain the protest.

          The RFP contemplated the award of a contract for a 4-month base period, one
          8-month option period, and four 1-year option periods for the following services:
          janitorial, grounds maintenance, refuse collection and disposal, inspection/cleaning
          of sewer/drain systems, replacement of air filters for air conditioning systems, and
          service calls. Gemmo is the incumbent contractor for many of these services,
          although this RFP includes some services beyond those included in the incumbent
          contract. The RFP included line items for fixed-price requirements and separate line
          items for estimated indefinite-quantity requirements. Award was to be based on a
          best value determination, considering price and three technical factors--past
          performance, corporate capability and quality control. The corporate capability

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most