B-283749 1 (1999-12-29)

handle is hein.gao/gaocrptajnh0001 and id is 1 raw text is: 

   h
                   -e GeAtOa
 E                                                               Comptroller General
                                                                 of the United States
United States General Accounting Office
Washington, DC 20548



         Decision


         Matter of: Industrial Builders, Inc.

         File:      B-283749

         Date:      December 29, 1999

         Philip L. Bruner, Esq., and William L. Roberts, Esq., Faegre & Benson, for the
         protester.
         Marvin T. Fabyanske, Esq., and Arlene D. Anderson, Esq., Fabyanske, Westra & Hart,
         for Swanberg Construction Company, Inc., an intervenor.
         Robert M. Andersen, Esq., Karen Da Ponte, Esq., and Steven P. Adamski, Esq.,
         U.S. Army Corps of Engineers, for the agency.
         Susan K McAuliffe, Esq., and Christine S. Melody, Esq., Office of the General
         Counsel, GAO, participated in the preparation of the decision.
         DIGEST

         Under invitation for bids (IFB) for construction of water control structure, agency
         reasonably rejected bid as unbalanced where bidder failed to allocate the cost of a
         cofferdam (a dewatering measure) among related work items requiring dewatering
         measures, as provided in the IFB, and instead included the cost of a cofferdam in its
         lump-sum line item price for a relatively minor work requirement for clearing,
         grubbing, and snagging of debris on the site, rendering the bidder's price for that line
         item many multiples higher than the government's estimate for the item and the
         other bids received; rejection of the bid was proper based upon agency's reasonable
         determination that the unbalancing posed an unacceptable risk that the government
         would make a substantial payment to the bidder upon completion of the required
         clearing, grubbing, and snagging work, without any assurance that the bidder would
         have constructed the cofferdam which was included in its price for that line item.
         DECISION

         Industrial Builders, Inc. (1131) protests the rejection of its bid as unbalanced under
         invitation forbids (IFB) No. DACW37-98-B-0017, issued by the U.S. Army Corps of
         Engineers, St. Paul District, for the installation of a new water control structure at
         the outlet of a Lake Traverse flood control reservoir, located on the Minnesota/South
         Dakota border.


We deny the protest.

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most