B-182601 1 (1975-06-03)

handle is hein.gao/gaobadciy0001 and id is 1 raw text is: 



                    4         THE  COMPTROLLER GENERAL
 DECISION        (2) OF THE               U N ITED    STATES
                            W- VA  S H ING T 0N,  0.C.   20 5468

                                                      97-2-33

 FILE: B-182601                      DATE:    June 3,1975

 MATTER OF: Sweitzer Construction Company


 DIGEST:

     Request by agency for decision on alleged doubtful error in
     bid where contractor claims increase in price on basis that
     it never agreed to furnish at its bid price certain require-
     ments discovered after award to have been excluded from copy
     of specification originally furnished to bidder, may not be
     considered under bid correction procedures.


     The Veterans Administration has requested a decision as to
whether an alleged mistake may be corrected after contract award.
The matter was submitted here pursuant to Flederal Procurement
Regulations (FPR) § 1-2.406-4(j) (1963 ed.), which provides for
the submission to this Office of doubtful cases involving possible
correction of mistake in bid price.

     Contract No. V618-C-694 was awarded to the Sweitzer Construc-
tion Company for the construction of an education building and con-
necting corridor at the Veterans Administration hospital in
Minneapolis, Minnesota.  The contract was awarded pursuant to two-
step formal advertising procedures.

     Apparently, Sweitzer's second tier subcontractor for the
electrical work submitted its quotation and proposal on the basis
of a copy of the Government's specification which contained a blank
page 32.  After the contract was awarded to Sweitzer, the electrical
subcontractor received additional copies of the specification. In
comparing these subsequent copies with the original work copy of the
specification the subcontractor discovered that specifications were
included on page 32 of the former copies. Page 32 generally
required conduits for telephone systems, conduits for a closed cir-
cuit television system and a lightning protection system. Subsequently,
the Veterans Administration decided that the building should not be
equipped with a lightning protection system. However, Sweitzer has
requested an additional $5,898 to furnish both conduit systems.

     The solicitation required offerors to submit during the first
step of this procurement. a technical proposal to enable the Govern-
ment to determine the acceptability of the work offered. Specifically,

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most