B-183134 1 (1977-06-02)

handle is hein.gao/gaobaagte0001 and id is 1 raw text is: 


DOCUMENT BESUME


02629 - [A1612597] (Restricted)

(Construction of Space Shuttle Facilities at Vandenberg Air
Force Base]. B-183134. June 2, 1977. 2 pp. + enclosure (6 p.).

Report to Pep. George H. Mahon, Chairman, House Committee on
Appropriations; by Elmer B. Staats, Comptroller General.

Issue Area: Facilities and Material Management: Design and
    Cons'ruction of Federal Facilities (707) ; Federal
    Proctrement of Goods and Services: Notifying the Congress of
    Status of Important Procurement Programs (1905).
Contact: Procurement and Systems Acquisition Div.
Budget Function: National Defense: Department of 9efense -
    Procurement & Contracts (058).
Organizaticn Concerned: Department of Defense; Department of the
    Air Force: Vandentirg AFB, CA; Department of the Air Force.
Congressional Relevance: House Committee oi Appropriations;
    House Committee on Appropriations: Military Construction
    Subcommittee.

         GAO examined the reasonableness of the Department of
Defense's (DOD's) estimated cost of the planned space shuttle
facilities at Vandenberg Air Force Base, California,
particularly from the standpoint of me-ting total DOD space
shdttle facilities requirements anA providing for complete
usable facilities. Findings/Conclusions: Requirements for DOD
facilities to sLpport the Space Transportation System (STS) are
not fully defined, and cost estimates are still being refined
and validated. The lack of firm requirements and cost estimates
is due to the Aynamic nature of the program in that it is still
changing in terms of operational concepts and anticipated levels
of operation. The request for military construction funds does
not include all costs necessary to provide completely functional
facilities. Additional costs zre included 'nder the support
equipment and the research, design, test, ai'd evaluation
apprcpriation codes. Recommendaticns: To get better visibility
as to the total costs of DOD's STS facilities, the
Appropriations Committee of the House should require the Air
Force to: identify all items necessary for the construction of
completely usable and functional facilities that are not being
funded under the military construction appropriation; and
prepare a separate DD Form 1391 for each STS facility.
(Author/QM)

What Is HeinOnline?

HeinOnline is a subscription-based resource containing thousands of academic and legal journals from inception; complete coverage of government documents such as U.S. Statutes at Large, U.S. Code, Federal Register, Code of Federal Regulations, U.S. Reports, and much more. Documents are image-based, fully searchable PDFs with the authority of print combined with the accessibility of a user-friendly and powerful database. For more information, request a quote or trial for your organization below.



Contact us for annual subscription options:

Already a HeinOnline Subscriber?

profiles profiles most